BACnet MS/TP vs IP: when and how to implement each (and together)

Technical Guide12 min read
Building automation router linking BACnet MS/TP field bus and BACnet/IP Ethernet backbone

There is no "competition" between these two. Both support the BACnet Application Layer and differ only in the Physical Layer. You would expect IP-based networking to appear at Building and above, hosting e.g. server(s), engineer's PC(s), major controllers etc. And of course you'll find MS/TP used extensively below this, to accommodate the high number of inexpensive controllers found at terminal points.

Your key question therefore becomes: what is the cut-off point for the transition from MS/TP to IP? Where should your router(s) be placed, and how will you number and configure the two domains such that they can be successfully integrated?

You will see this junction in action when you connect the Building Management System to a wider corporate IT environment, or to a Data Centre's DCIM suite. In this article we discuss the key characteristics of each technology, the typical multi-level implementation required, configuring the MS/TP to IP conversion point, and the common issues that cause loss of MS/TP communication.

PODTECH Connect Building Data Across Systems

PODTECH create bespoke solutions to allow the collection and presentation of important data streams from buildings and other facilities.

Visit

TL;DR

  • As noted above, you will typically see BACnet/IP deployed across the higher tiers of a facility, while BACnet MS/TP is used to link the large numbers of minor controllers that form the bulk of a system.
  • So your solution will almost certainly comprise one or more MS/TP rings connected to the IP network via a router.
  • The MS/TP link offers a reduced cabling requirement and cost, but is subject to a number of caveats including its lower communication rate, maximum number of controllers supported and the rigour required in installation.
  • Similarly, the numbering of the various network and BACnet IDs will play an important role in ensuring compatibility with external systems.
  • Plan this aspect of your project carefully.

Table of Contents

What each protocol actually is

BACnet is defined in the ASHRAE standard (currently ANSI/ASHRAE 135) and prescribes a set of services for controlling and communicating between building components. A number of Physical Layers have been identified by the Standard.

Of these, BACnet MS/TP (i.e. Master-Slave / Token Passing) and BACnet/IP are now widely used. The former was introduced specifically to meet the demands of the cheap controller market. NIST's guidance document on how to write a BACnet specification states that "the MS/TP operates using an EIA-485 based physical medium ... has a maximum data rate of approximately 76.8Kbps and represents the least expensive local area network available under the BACnet standard". Further detail on the operation of the MS/TP link is given in a paper by NIST on the Medium Access Control function. Of particular relevance is that requests on the MS/TP link are always initiated by one or more "master" nodes. Slaves are permitted to reply to a call but cannot make an initiating call.

Consequently, the successful deployment of an MS/TP network requires careful consideration of the devices and their behavior. With every additional master node, there is an associated increase in the time taken for the token to traverse the whole loop. Any deviant node(s) will have a detrimental impact.

By contrast, BACnet/IP simply extends the BACnet messaging to operate over the ubiquitous UDP protocol, using the TCP/IP stack. Devices are assigned an IP Address, and can be switched, segregated, routed etc as with any other IP network. By convention, all BACnet devices listen for communications on UDP port 47808 (hex 0xBAC0).

BACnet MS/TP vs IP: the differences that matter

FeatureBACnet MS/TPBACnet/IP
MediumTwisted pair, RS485, daisy-chainCATx, star topology, usually to local patch panel
Data rate~9.6 - 115kbps, max 76.8kbps10Mbps - 10Gbps+
Node IDMAC 0-127IP address, BACnet Net No.
Max nodes32 (or higher with reduced load transceiver), 128 MastersDependent on subnet(s)
CostCheapest BACnet PLayerMore so at controller level; negated if existing LAN
MaintenanceStraightforward, dependent on quality of installRequires knowledge of IT practices and tools
Use caseUnitary, VAV, split-system etcBackbone, Engineer's stations, Plant, site-wide

Some further comments on these attributes. From the Accuenergy comparison table linked above, the effective upper limit for controllers on a single MS/TP daisy-chain is around 100 (due to the allocation of certain values for special purposes). The nominal load of 32 nodes and maximum number of Masters of 128 are confirmed by a paper from Contemporary Controls, who go on to advise a target of 32-64 controllers per ring. Finally, the maximum cable run achievable on the MS/TP is quoted as 5000ft (1524m) with degraded data rates by BACnet's "at work" publication.

Speed is rarely the deciding factor

At first glance, 76 kbps vs 100 Mbps makes MS/TP look hopelessly outdated. That said, as noted in the literature published by Trane, here BACnet/IP is likely to incur a greater installation cost per point, and the speed will only come into play if significant volumes of data must be moved - not normally required for HVAC. Sending the reading and state of a VAV at regular intervals will happily work over a slower link.

Of course, once you begin trending points from a central plant, displaying information to staff or populating other IT systems, you'll find yourself requiring an IP-based backbone.

Distributing the protocols through the hierarchy

This is broadly what will emerge from any significant building owner. In an IEEE 802.3 white paper, BACnet/IP was found to occupy the top levels of the protocol stack, with MS/TP distributed further down the hierarchy, and interoperability demonstrated at the highest level.

As discussed above, the examples are clear:

  • As per the NIST publication, the GSA Region 8 spec prescribes fast links using BACnet/IP to new DDC controllers controlling key M&E plant, with remaining plant controlled via MS/TP.
  • For new developments under Wake County's 2023 BAS requirements, a High tier of BACnet/IP will run between the server, office PCs and Building Controllers. From here, further sub-networks of MS/TP (or otherwise) can be added, passing via a suitable router. Large central plant and AHU controllers would likewise be placed directly on this backbone.
  • At Duke University, the spec states that all Control Panels should operate using BACnet/IP (subject to exception). Packaged plant will continue to be linked together using MS/TP.

Ira Goldschmidt (consultant) goes further in his article on Physical Architecture in Design in ACHR News, recommending the use of IP to link intermediate DDC controllers except for lower risk applications. His proposal is that one intermediate controller will be assigned to each AHU, and link the associated VAVs on an MS/TP bus, and similarly individual floors will comprise an MS/TP ring. Where required, routers can then extend this. Furthermore he cautions that multiple VAVs serving the same space should not all be linked to the same controller, to reduce the impact of any failure.

Finally, the NIST guide states explicitly that the MS/TP protocol is intended to support the unitary controllers, and is not suitable for use as a backbone network.

Typical BACnet hierarchyBACnet/IP backboneServer • Engineer PC • Building Controllers • Major Plant / AHU ControllersRouterRouterRouterFloor / AHU MS/TP segmentVAV / unitary controller busPackaged plant busUse IP for backbone and major systems; use MS/TP for dense, low-cost field controllers.

Rule of thumb

If your end-point is a Server, PC, Plant Controller, Large AHU Controller or similar, i.e. something that will span multiple IP sub-networks and possibly sites, you should specify IP. If it consists of a series of equivalent controllers within a limited footprint and you are primarily concerned with minimizing the amount of cable, then MS/TP is appropriate. In any other case, expect both with one or more routers.

Migrating from MS/TP to IP

Those looking to transition their existing infrastructure to IP will rarely need to consider removing their current MS/TP system. The requirement will be to implement a suitable BACnet Router. Per the NIST document, these allow the combination of disparate LANs (e.g. Ethernet and MS/TP) and the extension of a given LAN once the pool of available MACs has been exhausted. Ideally the contract should stipulate that the Network Numbering Plan and starting point for Routing Tables are determined by the Contractor.

A typical set of parameters to configure on the Router includes:

  1. Network Numbers. Each IP and MS/TP LAN on the system will require a unique BACnet Network Number between 1-65534.
  2. MS/TP Router MAC. Should be assigned a distinct value from other devices on the respective MS/TP LAN. The NIST publication allocates MAC=0 to the Router, and allows no more than one per network.
  3. Baud Rate. Common to all devices on the LAN.
  4. Max Masters. Should correspond to the maximum actual Master MAC ID. The Token will cycle through the remainder unnecessarily.
  5. Port. Default will be UDP 47808, subject to any organizational convention. Note implications of Broadcasting across IP subnets.

As noted above, you will additionally need to deploy a BBMD to distribute Broadcasts across multiple IP subnets, and this should be configured in advance.

It can also be beneficial to break the MS/TP bus into several shorter runs, terminating at the Router. The Contemporary Controls paper highlights that if any single device fails on an MS/TP-only LAN, the effect will propagate to all other endpoints. By introducing Routers, and reducing the length of each LAN, unwanted Broadcasts can be prevented from reaching the less capable CPUs, and the impact of any failed device contained.

Troubleshooting the MS/TP LAN

Again, issues with the MS/TP system will most commonly relate to the cabling and installation. Based on Duke's requirements, the MS/TP bus should consist of 1.5p screened twin (i.e. 3 conductors) installed as a single unbroken loop. Star connections, 'T' spurs and other ad-hoc modifications are prohibited. You should therefore verify the installation meets this.

A failing or unreliable bus can then be investigated as follows:

  • Check the polarity at each device. If one has A and B swapped, the rest of the bus may still function.
  • Termination. There should be a 120 ohm EOL terminator on the actual cable at both extremities of a segment, and nowhere else. Lack of terminators, or additional ones within the segment will lead to reflection and frame errors.
  • Bias. If there is no common point of bias, the bus will assume some floating potential and collect spurious signals.
  • Rate. All nodes and repeaters on a given segment must operate at the same baud.
  • Device Instance(s). Conflicting MACs on the same segment, and conflicting Device Instances across the site, will manifest as apparent wiring issues.
  • No. of Masters. Should not be set lower than required to ensure all relevant devices can receive the master token.
  • Number of devices. Once you exceed ~32 (approaching 64), consider adding a router to subdivide the segment.

There are two very powerful tricks. First, cut the bus in two and identify which section retains communication. This will halve your search space. Second, replace a 'good' and 'bad' node with each other. If the issue follows the node, you've identified a faulty or misconfigured unit. If the issue remains fixed to the position, the fault lies in the cabling.

Finally, check the counters on any intermediate router(s). You may find they report vastly different volumes of IP vs MS/TP packets, or exclusively 'Idle' and 'Poll for Master'. In either case, the router has concluded that it's the only node on the network, most commonly due to rate or cabling faults.

BACnet integration with existing BMS and IT systems

Any Building Management System is limited by the volume and quality of data it is able to ingest. To achieve a successful deployment, Controls, IT and Facility Management will need to collaborate.

As noted previously, under the Duke process this involves reaching agreement with the Building Owner's IT department about IP scheme (including network, default gateway, physical switch and port allocation), and ensuring the uniqueness of Device Instance, Network and MAC address. A dedicated VLAN is highly recommended, along with explicit definition of the associated switch port(s).

You will need to maintain a detailed record of your site's topology, and a table of all Network and Device Instances in use.

All products supplied must meet the requirements of ANSI/ASHRAE 135 and hold a valid BTL, supported by PICS and BTL records. Additionally, the product must continue to perform safely and reliably in the event of loss of BACnet connectivity, a sensible minimum requirement.

Prior to close-out, it is important to test discoverability of all declared assets, cross-segment communications and network performance. Where available, request Change of Value notification to minimize unnecessary queries to the network.

Consideration also needs to be given to the security of BACnet communications. As discussed in our article on BACnet Secure Connect, introducing security has significant implications.

Application to Data Centres

Typically, the data centre mechanicals will be communicated via BACnet (CRAH, Chiller, Pump, Generator etc.), complemented by SNMP and Modbus feeds from the IT and Electrical plant respectively. Your choice of communication will have a material effect on the fidelity of data available to your DCIM solution. By exposing the data centre plant over IP, you enable high-volume data collection, while retaining cost-effective MS/TP backbones to service the distributed low-level controllers. Further discussion on master systems and our Smart Buildings solutions can be found here.

Key considerations for your deployment

  • Identify and categorize all plant (i.e. Backbone and Field level).
  • Deploy Backbone plant to the BACnet IP layer, defining the required networks and BBMD configuration.
  • Organize Field plant onto multiple MS/TP segments, separated by router(s) e.g. per floor.
  • Define and record Network Number, MAC and Device Instance for each asset.
  • Specify appropriate screened interconnect, terminators and set Baud.
  • Reach agreement with IT as per points above.
  • Test and sign off the deployment based on the defined network design.

Final thoughts

Deciding whether to deploy MS/TP or IP is relatively straightforward. However, the reality is that the extent and topology of a site's BACnet network is likely to evolve significantly from the original specification. Additional controllers, rogue T-Taps and duplicated Device Instances will inevitably occur, leaving your BMS unable to provide a complete view of your building.

Having deployed many complex data centres and other mission-critical environments, we believe the underlying BACnet network should be designed and implemented with equal rigour as the systems that consume its output. We aim to consolidate telemetry, DCIM and other building automation data from BACnet, Modbus and SNMP into a unified system, using a common nomenclature and address space, and create an intentional transition between serial and Ethernet-based networks.

Where you have no tolerance for system outages, this includes considering your BACnet Router, Network Numbering and Commissioning Package as integral to the solution. In effect, the BACnet Router provides the interface from a chaotic physical network to something an end-user can rely upon.

Harry

Consolidating your BACnet assets

Whether you have MS/TP loops across various levels, BACnet/IP on building controllers or a centralized data room, PODTECH can consolidate these. This may be achieved via Master System Integration, Data Centre Integration Management (DCIM) and/or Data Room Telemetry, alongside our monitoring solutions and sensor portfolio for both hard- and soft-wired applications. We guarantee >99.9% availability and have completed 250+ installations. View our complete offering here and learn about our process when undertaking DCIM Consultancy.

See our blog on completing an Industrial Automation Setup for further information.

FAQ

Does BACnet MS/TP offer greater speed compared to BACnet/IP?

As per the NIST publication, the maximum achievable data rate on an MS/TP bus is ~76kbps. BACnet/IP will operate at a minimum of 10Mbps and as high as 10Gbps over an Ethernet infrastructure. While this has little bearing on the performance of typical MS/TP field devices, it continues to find wide usage here.

Can I use both protocols within my facility?

Certainly, and indeed the majority of sites will. A suitable BACnet Router will be required to link the separate networks, requiring a distinct Network Number on each leg. As described previously, the BACnet protocol will be common between both.

What is the maximum number of devices per MS/TP Bus?

Ideally, the protocol allows for a 'Load' of 32. Some reduced-load transceivers will permit additional devices to share the Bus, and there is a limit of 128 Master MAC addresses. Contemporary Controls suggest 32-64 devices per Bus, and breaking down to multiple Buses (and hence Routers) will mitigate any failure of individual devices.

Is there still a role for BACnet?

Definitely. Many of the Specification examples referenced throughout this article (Duke, Wake County, GSA) are predicated on the use of BACnet, and it is likely to remain the lingua franca of disparate controller ecosystems. Further developments are being made to enable secure communication over the protocol.

What typically gives rise to failures on an MS/TP Bus?

Faults relating to the cabling and associated parameters will be the key culprits. Check for correct polarity, appropriate (or absent) terminators, baud rate settings, MAC address conflicts and the Max Masters parameter.